Tuesday, July 10, 2018


PINE HOLLOW C.C. AERATION SCHEDULE

GREENS:
  • **March 4/19/18 – 3/8” Hollow Tine Aeration w/ Heavy Topdressing (5%)
  • *Monthly (May to July) – ¼” Solid Venting Tine (no removal)
  • ***August 8/13/18 or 8/20/18– ¼ ” Hollow Tine Aeration w/ Dry-Ject Sand Injection and Light Sand Topdressing (4%)
  • ***October 10/29/18 – ½” Hollow Tine Aeration w/ Heavy Topdressing and/or 2mm Sand Inject Graden (13%)
  •   ***December – 5/8” Solid Deep Tine Aeration w/ Heavy Topdressing
*    Minimal disruption to putting surface (healing time a few days)
**  Medium disruption to putting surface (healing time 7-10 days)
***Most disruption to putting surface (healing time 10-14 days)
Emphasis put on removing 20% of surface area per year
TEES:

  •    March 4/21/18 - 5/8” Hollow Tine Tee Aeration with Sand Topdressing
  • August 8/14/18- 5/8” Hollow Tine Tee Aeration with Sand Topdressing
  • October - 5/8” Hollow Tine Tee Aeration with Sand Topdressing

FAIRWAYS:
  •  March 3/12/18 – ¾” Solid Deep-Tine Aeration (no cleaning necessary)
  • March 3/27/18 – 5/8” Hollow Tine Aeration (DID NOT HAPPEN WEATHER)
  • August -  ¾” Solid Deep-Tine Aeration (no cleaning necessary) w/ Verticut
  • October – Graden Dethatching of Fwys/Approaches
  • November - ¾” Solid Deep-Tine Aeration


ROUGHS:

  • Beginning November Aeration of all Roughs


No comments:

Post a Comment