PINE HOLLOW C.C. AERATION SCHEDULE
GREENS:
- **March 3/22/21– 3/8” Hollow Tine Aeration
w/ Heavy Topdressing (5%)
- *Monthly (May to July) – ¼” Solid Venting Tine (no removal)
- ***August 8/9/21 or 8/16/21– 3/8 ” Hollow Tine Aeration and Light Sand Topdressing (5%)
- ***October 10/25/21 – ½” Hollow Tine Aeration w/ Heavy Topdressing (8%)
- ***December
– 5/8” Solid Deep Tine Aeration
w/ Heavy Topdressing
* Minimal disruption to putting surface (healing
time a few days)
** Medium disruption to putting surface (healing time 7-10
days)
***Most disruption to putting surface (healing time 10-14 days)
Emphasis put on removing 20% of surface area per year
- March 3/23/21 - 5/8” Hollow Tine Tee Aeration with Sand Topdressing
- August 8/10/21- 5/8” Hollow Tine Tee Aeration with Sand Topdressing
- October - 5/8” Hollow Tine Tee Aeration with Sand Topdressing
FAIRWAYS:
- March 3/1/21 – ¾” Solid Deep-Tine Aeration (no cleaning necessary)
- March 3/24/21 – 5/8” Hollow Tine Aeration *may be delayed until fall*
- August - ¾” Solid Deep-Tine Aeration (no cleaning necessary) w/ Verticut
- October – Graden Dethatching of Fwys/Approaches or ¾ Solid Deep-Tine
- November - ¾” Solid Deep-Tine Aeration
ROUGHS: