- Actual mowing heights – GREENS .115, TEES/COLLARS, .300, APPROACHES/COLLECTIONS .325, FAIRWAYS .375, STEP-CUT 1”, ROUGH 2.25”.
- Our 2019 Golf Season has started slow with significant rain events. Over the past few weeks rough has improved and playing surfaces have healed from aeration. This process was slow!
- PUMPTATION– 100 hp. Pump replaced this off-season is working to full capacity. 200 hp. Pump has been flushed and serviced and is ready to take on the season, this station has had issues for years but since the upgrades made in 2015 this motor and pump have been reliable.
- Silvery Thread Moss eradication program for greens on is going. This process has shown significant improvements on most greens with populations decreasing by 80% but needs to be altered due to some aggressive varieties.
- Bunkers have been severely impacted from extreme weather events causing failure of bunker liner, contamination, and bunker collapse. Our hazards have been maintained to the best of our ability but these issues are not going away without renovation.
- #1 Green continues to be a topic of conversation due to green speed gains over five years and plans are in place to rebuild the green and front right bunker with Macdonald & Sons.
- Improve contours in fairways and green expansion areas with additions and subtractions. These areas are part of Hanse Golf Course Design’s original plan and fairway expansion will be discussed with all professional staff before work begins.
- Our new bunker built during the offseason is open and provides more practice options. This area will join #10 fairway with the collection from #14 green and add variety and style.
- Drainage installation at chipping area approach (driving range), #6 approach, #5 approach, #8 approach, #15 approach, and #16 fairway.
- Fall Aeration – Scheduled and will be aggressive to improve playing conditions and maintain overall turf health (see attached).
- Pine Hollow Green’s Department Blog – pinehollowgreens.blogspot.com
PROPOSED CAPITAL
PROJECTS
- LONG RANGE PLAN – Discussion with Committee and Board should take place to develop a Long Range Plan. This plan protects our interests, sets goals and provides information to set aside money. Macdonald & Sons can provide this plan with an architect to help the Club and Supt.
- LANDSCAPE - #1 Tee re-organize material and add plant material. #3/#7 screen out dumpsites.
- GOLF COURSE - #1 Green and Bunker Complex fall 2019. Tee Complex Construction #11 and #12/#14.
- GOLF COURSE - Cont. Tree Maintenance Plan for 2018/2019 late fall to winter: In/Out House work done with a plan to replant.
- EQUIPMENT - Purchase Deep-Tine Aeration Unit. Purchase New Walk behind Greens mowers and new utility carts (2019).
- BUDGET- Continue to look at areas to improve our bottom line while increasing Member satisfaction with our Club’s biggest asset.